Waterproofing contractor software
Built inside a waterproofing business, for the way waterproofing work is actually measured and billed.
How a waterproofing contractor actually bills
Your BOQ items are areas and lengths: square feet of membrane, running metres of joint treatment, injection points, coats of coating. A bill is a measured quantity against one of those items, and the client’s QS will check it against what was billed before.
The BOQ lines a waterproofing contractor prices
The items and rates are yours. These are examples of how the work is usually priced, and of the measured quantity each one is billed on:
- Terrace and roof slab waterproofing: area, in square metres.
- Toilet and bathroom waterproofing: area, in square metres.
- Basement raft and retaining-wall membrane: area, in square metres.
- Construction joint treatment and grouting: length, in running metres.
- Polyurethane injection grouting: length in running metres, or a count of injection points.
- Protective screed over membrane: area, in square metres.
Each measurement is recorded against its BOQ item, and the RA bill is built from those measurements.
Three problems specific to this trade
- The work disappears under the next trade. Once screed or tiling goes over your membrane, the only proof it was done to specification is the record you made at the time.
- Rectification is indistinguishable from new work unless the original measurement, date and zone are on record — which is what decides whether it is chargeable.
- Material consumption is the margin. Coating and membrane are the cost, and if drums reach a site without being attached to a project, the job’s cost is wrong.
The chain, in your vocabulary
Work order and BOQ, then measurement sheets per zone, then an RA bill with a cumulative position. Alongside it: daily muster for the crew, overtime approved rather than argued, and material requests and purchase orders tied to the same project.
Work stages that match the job
Waterproofing contractors start with default work stages for daily progress reports, which you can change in Settings:
- Construction joint opening, chipping and joint packing
- Pipe installation and grouting
- Grinding and coving
- Water ponding test and monitoring
- Waterproofing coat 1 and coat 2, and curing
- Plaster, screed and marking
On the Professional plan, BOQ examples are set up for the work you price: surface preparation, polymer-modified cementitious coating and protection screed.
Work orders, BOQ, measurement and RA bills are included from the Professional plan. Projects, daily progress, attendance, labour, payroll, procurement and stock are included in every plan.
See it against a waterproofing job