Why waterproofing work gets executed but not billed
A practical look at where the money stalls between site and invoice.
Ask a waterproofing contractor why a job is unbilled and the answer is almost never that the client refused. It is that the measurement never made it off site in a form anyone could bill from.
The measurement is the invoice
For a specialist contractor, the bill is not an estimate. It is a measured quantity against a BOQ item: square feet of treated area, running metres of joint, number of injection points. If the measurement is a photograph on someone’s phone, the bill is an argument waiting to happen.
Three places it stalls
- Measured but not recorded. The work is done and checked, but the sheet is filled in days later from memory, and the quantity is rounded down to be safe.
- Recorded but not approved. The sheet exists, but nobody with authority has signed it, so the office will not raise the bill against it.
- Approved but not cumulative. The RA bill does not reconcile to what was billed previously, so the client’s QS sends it back.
What actually fixes it
Not more chasing. A measurement recorded at the time, against the BOQ item it belongs to, with a dated approval and a running cumulative position. That is a record you can bill from, and a record you can defend six months later when someone queries a line.
This article replaces an earlier post at the same topic on this domain. If you arrived from an old link, this is the updated version.
If this is happening on your sites
The fix is a measurement recorded at the time, against the BOQ item, with a dated approval and a cumulative position. That is what the product does — see it on your own job.